
Marine Infrastructure Development and Installation
Provision of 120T BP DP2 AHTS to Support SBM Interchange
Client: West African Oilfield Services Ltd / Hydrodive Nigeria Ltd / SPDC
Offshore Forcados
Project Scope
What Was Delivered
Deployment of a heavy-duty 120-Ton Bollard Pull (BP) Dynamic Positioning 2 (DP2) Anchor Handling Tug Supply (AHTS) vessel to manage a critical Single Buoy Mooring (SBM) interchange setup.
The Challenge
Operational Complexity
Maintaining precision subsea positioning and extreme line tension management during heavy infrastructure uncoupling in volatile open-ocean currents over a multi-month schedule.
Our Solution
How Ridok Executed
Utilizing advanced DP2 automation and a veteran engineering crew, Ridok safely balanced anchor arrays and structural subsea loads throughout the SBM lifecycle without a single safety infraction.
Project Gallery





