Provision of 120T BP DP2 AHTS to Support SBM Interchange
Marine Infrastructure Development and Installation

Provision of 120T BP DP2 AHTS to Support SBM Interchange

Client: West African Oilfield Services Ltd / Hydrodive Nigeria Ltd / SPDC
Offshore Forcados
Project Scope

What Was Delivered

Deployment of a heavy-duty 120-Ton Bollard Pull (BP) Dynamic Positioning 2 (DP2) Anchor Handling Tug Supply (AHTS) vessel to manage a critical Single Buoy Mooring (SBM) interchange setup.

The Challenge

Operational Complexity

Maintaining precision subsea positioning and extreme line tension management during heavy infrastructure uncoupling in volatile open-ocean currents over a multi-month schedule.

Our Solution

How Ridok Executed

Utilizing advanced DP2 automation and a veteran engineering crew, Ridok safely balanced anchor arrays and structural subsea loads throughout the SBM lifecycle without a single safety infraction.

Project Gallery
Provision of 120T BP DP2 AHTS to Support SBM Interchange — Gallery 1
Provision of 120T BP DP2 AHTS to Support SBM Interchange — Gallery 2
Provision of 120T BP DP2 AHTS to Support SBM Interchange — Gallery 3